It’s expected to be running by the summer, although the two companies which have submitted bids haven’t had them formally accepted yet.
TfL has already spent £16.7m on the scheme, with the cost of the bridge repair expected to be up to £163m.
The operator has already received bailouts of nearly £3bn.