South Western Railways is consulting on whether or not to make permanent cuts made during the pandemic, which saw peak-time services halved, and off-peak trains reduced to one an hour.
The operator says it’s trying to reduce congestion in the Wimbledon area.
Rish-hour services via Leatherhead between London Waterloo and Guildford were also reduced by half.