Inspectors found a crack in the structure has worsened over the past week, probably due to the extreme heat.
The council says they worked round the clock to reduce the temperature of the cast iron bridge, including hosing it down with cold water.
It closed to cars and buses last April, but remained open to pedestrians and cyclists until now.
The repair bill is believed to be £140m.